Campus Construction Map
Download a map showing key construction sites and related impacts on the Evanston campus:
- Central Utility Plant improvements
Impacted through September 2026 - Kellogg Education Center (and Pancoe Drive, Lakefront Path)
Impacted through Fall 2027- Pancoe Drive closed
- Lakefront Path closed sporadically
- Bobb-McCulloch Renovation
Bobb closed through Summer 2026; McCulloch closes Summer 2026 through Summer 2027