Building Reactivation

In late March, Facilities Operations reduced the operation of certain building systems and services to save energy, reduce costs and focus limited essential staff resources to the most effective locations.

Buildings will be reactivated systematically. Learn more about building systems that will need to be returned to operating conditions. 

Once buildings are reactivated and the unit's Return to Campus Plan Summary & Checklist is approved, units can begin returning to their spaces. 

Reactivation Schedule

Find the planned building reactivation dates, which should be incorporated into your department's Return to Campus Plans. For some buildings, the dates are TBD and will be based on school or unit plans. In some instances, only portions of buildings have been cleared for occupancy. Student residences, which are projected to open for student access in August 2020, are not included in this listing.

Legend:

  • Green dot indicates Building has been prepared for occupancy. 
  • Yellow dot indicates Building has been partially prepared for occupancy. 
  • Red dot indicates Building has not been prepared for occupancy. 
Building NameStatusAnticipated Opening DateStatusCampus
1201 DavisGreen dot - Prepared for occupancyOpenPreparedEvanston
1800 ShermanGreen dot - Prepared for occupancyOpenPreparedEvanston
1801 HinmanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1801 MapleGreen dot - Prepared for occupancyOpenPreparedEvanston
1808 ChicagoRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1809 ChicaoRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1810/12 ChicagoRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1810 HinmanGreen dot - Prepared for occupancyOpenPreparedEvanston
1812 HinmanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1813 HinmanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1815 ChicagoRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1818 HinmanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1819 HinmanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1840 OakGreen dot - Prepared for occupancyOpenPreparedEvanston
1902 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1908 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1914 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1918 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1922 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1936 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1940 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
1948 Ridge and GarageGreen dot - Prepared for occupancyOpenPreparedEvanston
2000 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
2006 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
2010 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
2016 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
2020 RidgeGreen dot - Prepared for occupancyOpenPreparedEvanston
2040 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
2046 SheridanRed dot - Not prepared for occupancyTBDNot PreparedEvanston
2122 SheridanGreen dot - Prepared for occupancyOpenPreparedEvanston
345 E SuperiorGreen dot - Prepared for occupancyOpenPreparedChicago
405/415 ChurchRed dot - Not prepared for occupancyTBDNot PreparedEvanston
515 ClarkRed dot - Not prepared for occupancyTBDNot PreparedEvanston
555 ClarkYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
600 HavenYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
616 NoyesRed dot - Not prepared for occupancyTBDNot PreparedEvanston
617 DartmouthRed dot - Not prepared for occupancyTBDNot PreparedEvanston
617 HavenRed dot - Not prepared for occupancyTBDNot PreparedEvanston
617 LibraryRed dot - Not prepared for occupancyTBDNot PreparedEvanston
617 NoyesRed dot - Not prepared for occupancyTBDNot PreparedEvanston
618 GarrettRed dot - Not prepared for occupancyTBDNot PreparedEvanston
619 ClarkGreen dot - Prepared for occupancyOpenPreparedEvanston
619 EmersonRed dot - Not prepared for occupancyTBDNot PreparedEvanston
620 LibraryRed dot - Not prepared for occupancyTBDNot PreparedEvanston
620 LincolnRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
625 ColfaxRed dot - Not prepared for occupancyTBDNot PreparedEvanston
625 HavenRed dot - Not prepared for occupancyTBDNot PreparedEvanston
625 NoyesRed dot - Not prepared for occupancyTBDNot PreparedEvanston
626 LibraryYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
627 DartmouthRed dot - Not prepared for occupancyTBDNot PreparedEvanston
629 ColfaxRed dot - Not prepared for occupancyTBDNot PreparedEvanston
629 NoyesRed dot - Not prepared for occupancyTBDNot PreparedEvanston
630 DartmouthRed dot - Not prepared for occupancyTBDNot PreparedEvanston
630 LincolnRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
640 ColfaxRed dot - Not prepared for occupancyTBDNot PreparedEvanston
640 LincolnRed dot - Not prepared for occupancyTBDNot PreparedEvanston
720 UniversityGreen dot - Prepared for occupancyOpenPreparedEvanston
906/910 UniversityGreen dot - Prepared for occupancyOpenPreparedEvanston
Abbott HallGreen dot - Prepared for occupancyOpenPreparedChicago
Alice Millar Chapel/ParkesYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
Allen CenterGreen dot - Prepared for occupancyOpenPreparedEvanston
AndersonYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
Annenberg HallGreen dot - Prepared for occupancyOpenPreparedEvanston
Annie May SwiftRed dot - Not prepared for occupancy8/10/20Not PreparedEvanston
Athletic GroundskeepingGreen dot - Prepared for occupancyOpenPreparedEvanston
Block MuseumRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
BlomquistRed dot - Not prepared for occupancyTBDNot PreparedEvanston
Cahn AuditoriumRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Catalysis CenterGreen dot - Prepared for occupancyOpenPreparedEvanston
Chambers HallRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Cook HallGreen dot - Prepared for occupancyOpenPreparedEvanston
Cresap LabsGreen dot - Prepared for occupancyOpenPreparedEvanston
CUP - ChicagoGreen dot - Prepared for occupancyOpenPreparedChicago
Dearborn ObservatoryGreen dot - Prepared for occupancyOpenPreparedEvanston
Deering LibraryRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Evanston CUPGreen dot - Prepared for occupancyOpenPreparedEvanston
Evanston GarageGreen dot - Prepared for occupancyOpenPreparedEvanston
Family InstituteRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Fisk HallGreen dot - Prepared for occupancyOpenPreparedEvanston
Ford CenterGreen dot - Prepared for occupancyOpenPreparedEvanston
Frances SearleGreen dot - Prepared for occupancyOpenPreparedEvanston
Garrett Evangelical SeminaryRed dot - Not prepared for occupancyTBDNot PreparedEvanston
GaryGreen dot - Prepared for occupancyOpenPreparedChicago
Harris HallRed dot - Not prepared for occupancy8/10/20Not PreparedEvanston
Health ServicesGreen dot - Prepared for occupancyOpenPreparedEvanston
Henry Crown SPACYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
Hogan HallGreen dot - Prepared for occupancyOpenPreparedEvanston
Jacobs CenterRed dot - Not prepared for occupancyTBDNot PreparedEvanston
John Evans Alumni CenterRed dot - Not prepared for occupancyTBDNot PreparedEvanston
Kellogg Global HubGreen dot - Prepared for occupancyOpenPreparedEvanston
Kresge/CroweYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
Kresge UndergroundRed dot - Not prepared for occupancyTBDNot PreparedEvanston
Levy MayerGreen dot - Prepared for occupancyOpenPreparedChicago
Locy HallYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
Louis HallRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
LuntRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Lurie CenterGreen dot - Prepared for occupancyOpenPreparedChicago
LutkinRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Main LibraryYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
McCormickGreen dot - Prepared for occupancyOpenPreparedChicago
McCormick FoundationGreen dot - Prepared for occupancyOpenPreparedEvanston
McGaw OlsonGreen dot - Prepared for occupancyOpenPreparedChicago
Morton BuildingGreen dot - Prepared for occupancyOpenPreparedChicago
Mudd HallGreen dot - Prepared for occupancyOpenPreparedEvanston
Norris CenterYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
North Parking Acad/ClinicGreen dot - Prepared for occupancyOpenPreparedEvanston
North Parking GarageGreen dot - Prepared for occupancyOpenPreparedEvanston
Pancoe PavilionGreen dot - Prepared for occupancyOpenPreparedEvanston
Patten/GleacherYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
Pick-StaigerRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Rebecca CrownGreen dot - Prepared for occupancyOpenPreparedEvanston
RegensteinRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Research StorageRed dot - Not prepared for occupancyTBDNot PreparedEvanston
Rocky Miller ParkRed dot - Not prepared for occupancyTBDNot PreparedEvanston
Rubloff BuildingGreen dot - Prepared for occupancyOpenPreparedChicago
Ryan FieldYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedEvanston
Ryan HallGreen dot - Prepared for occupancyOpenPreparedEvanston
Ryan MusicRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Sailing CenterRed dot - Not prepared for occupancy8/10/20Not PreparedEvanston
Scott HallRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston
Searle BuildingGreen dot - Prepared for occupancyOpenPreparedChicago
ShanleyRed dot - Not prepared for occupancyTBDNot PreparedEvanston
Silverman HallGreen dot - Prepared for occupancyOpenPreparedEvanston
Simpson QuerreyGreen dot - Prepared for occupancyOpenPreparedChicago
South Parking GarageGreen dot - Prepared for occupancyOpenPreparedEvanston
Swift Hall and AnnexGreen dot - Prepared for occupancyOpenPreparedEvanston
Tarry BuildingGreen dot - Prepared for occupancyOpenPreparedChicago
Tech InstituteGreen dot - Prepared for occupancyOpenPreparedEvanston
Trienens CenterGreen dot - Prepared for occupancyOpenPreparedEvanston
University HallRed dot - Not prepared for occupancy8/10/20Not PreparedEvanston
Vandy Christie Tennis HutRed dot - Not prepared for occupancyTBDNot PreparedEvanston
Visitor's CenterRed dot - Not prepared for occupancy8/10/20Not PreparedEvanston
Walter/Ryan/WilsonGreen dot - Prepared for occupancyOpenPreparedEvanston
Ward BuildingGreen dot - Prepared for occupancyOpenPreparedChicago
Welsh-Ryan ArenaRed dot - Not prepared for occupancyTBDNot PreparedEvanston
WieboldtYellow dot - Partially prepared for occupancyPartially OpenPartially PreparedChicago
Wirtz CenterRed dot - Not prepared for occupancy8/24/20Not PreparedEvanston

Building Operating Conditions

Buildings are not designed to go dormant, and before occupancy by faculty, staff and students, each building’s systems and services will need to be returned to its standard operating conditions. This will involve at a minimum:

  • Flushing plumbing (domestic water) systems to remove stagnant water that is not suitable for consumption and returning potable chlorinated water to the building with testing/verification
  • Returning the building’s HVAC system to normal operating conditions and schedule, including replacement of filters, performance of necessary preventative maintenance, and a flush of the building’s air systems
  • Resumption of regular custodial services, including new COVID-19-specific cleaning protocols
  • Installation of COVID-19 signage to reinforce the core responsibilities for reoccupying campus