Northwestern University
  Search  
Northwestern
University Relations
UNIVERSITY RELATIONS
Media Relations
University Relations > Media Relations > Press Release
  About Media Relations  
    Who we are and what we do  
  News Headlines  
    Current headlines from Media Relations and Northwestern media coverage  
  Press Release Archive  
    Complete catalogue of Press Releases  
  Newsfeed/Audio  
    Faculty commentary and guest speakers  
  Observer Online  
    Northwestern's faculty and staff newspaper  
  Media Guide to Experts  
    Find faculty experts on a variety of subjects  
  Northwestern Fact Sheet  
    Northwestern facts and history  
  Media Contact Information  
    E-mail addresses and phone numbers  
Northwestern News
  [text only]    
   

MEDIA CONTACT: Megan Fellman at 847-491-3115 or fellman@northwestern.edu

May 18, 2004

Engineering Center to Be Energy Efficient

EVANSTON, Ill. --- The Ford Motor Company Engineering Design Center at Northwestern University, under construction on Sheridan Road, has been designed to be an innovative and environmentally sustainable building that will use about 20 percent less energy than one built to conventional high-quality construction standards.

Located just south of the Technological Institute, the six-story, 84,000-square-foot building will be the focal point for the Robert R. McCormick School of Engineering and Applied Science’s initiatives in design education, including the Engineering Design and Communications program for first-year undergraduates.

Early in the design process for the center, McCormick School Dean John Birge and the building committee established leadership in environmental sustainability as an objective for the $30 million facility to complement McCormick’s unique curriculum in engineering design.

“We want to build the most environmentally sustainable structure we can,” said Birge, “not only because conserving energy is the right thing to do, but because we want the building itself to be an important educational resource for our students, allowing them to see the positive aspects of a green building in an urban setting.”

To keep energy costs down, the building’s design will provide natural daylight to more than 75 percent of the building’s interior spaces, which is notable considering that two of the six floors are below ground. In addition, an automated solar tracking system throughout the building will close window shades in the face of direct sunlight and open shades in areas facing away from the sun. An innovative raised-floor system will provide more precise temperature control at the individual-occupant level, resulting in more efficient heating and cooling of interior spaces.

On the exterior, a number of measures are being taken to minimize the building’s impact on the surrounding environment:

- A light-reflective roof will reduce the “heat island” effect of the building on the site.

- Exterior lighting will light the ground and not the surrounding sky, reducing urban light pollution near the Dearborn Observatory.

- A specially integrated retention basin, located beneath the building, will capture rainfall that will be used to water the building’s surrounding landscape and the historic Shakespeare Garden to the east. Any excess will be returned directly to ground water rather than to the city sewer system.

The University engaged a team of experts in environmentally sustainable building design from the Rocky Mountain Institute in Snowmass, Colo., to review design constraints and recommend specific measures that could be implemented to achieve certification from the Leadership in Energy and Environmental Design. In addition, the building committee worked closely with The Garden Club of Evanston, whose members are the Shakespeare Garden’s caretakers.

The Ford building will house McCormick programs currently occupying leased space off campus. In addition to EDC, these programs include the Institute for Design Engineering and Applications; the department of computer science; the Master of Management and Manufacturing graduate program, which is run jointly by McCormick and the Kellogg School of Management; and the department of civil and environmental engineering’s Infrastructure Technology Institute.

The Ford Motor Company pledged $10 million in seed funding toward the design center, which is expected to be completed in summer 2005.