Goodrich House Building Renovation

For the 2015-2016 school year, the Goodrich House Residence Hall will be undergoing renovations as part of the Northwestern Housing Master Plan. The building is expected to open for the Fall 2016 quarter. An outline of the renovations to be completed is listed below:

Basement Floor:

  • Demolish existing spaces to make room for a new faculty apartment with bedroom, kitchen, study, and living areas.

1st Floor:

  • Demolish existing lounge spaces to make room for new lounge, kitchen, pantry, laundry, and flexible community spaces.
  • Modify the existing entry way to allow for more space when entering.
  • Created new accessible 2-bedroom, 1-bath suites.

2nd-4th Floors:

  • Replace flooring, fixtures, paint, and furniture in all bedrooms and corridors
  • Renovate all bathroom spaces