McGaw Pavilion Renovation

Project Team
Project Description & Statistics
Anticipated Completion


Project TeamMcGaw Pavilion

Project Management

Ron Nayler, Associate Vice President for Facilities Management
Bonnie Humphrey, Director of Facilities Management Design and Construction
Robert Carlton , Project Manager

Architect, Engineers & Consultants

Perkins and Will (Chicago, IL), Lead Architect
W.M.A. Consulting Engineers (Chicago, IL) MEP Engineers

General Contractor

Turner Construction Company

[ Back to top ]

Project Description & Statistics

Demolition Started 03/24/03
Demolition Finished 09/01/03
Construction Started 05/01/03

Basement

Demolish Dental School clinics, surgeries, B-3 escalators. Renovate corridors, B-4 elevator. Build mechanical infrastructure distribution, Medicine freezer farm.

1st fl.

Build Medical Education Clinical Education & Evaluation Center (CEEC) clinical skills training facility with 12 exam rooms, 2 consultation rooms, 4 training/conference rooms, 3 offices, toilet/changing rooms, computer testing room, Audio/Visual control/monitoring/review rooms (space demolished with McGaw-1 Anesthesiology project). Build entrance lobby, Medical Education 44-seat tiered case-study room.

2nd fl.

Demolish Dental School clinics/labs/offices. Build Medicine faculty/administration office suite with conference rooms, 31 offices (southeast area). Build 5 open-lab research suites (total ~103 2-person benches) with procedure alcoves, support facilities/special procedure rooms, linear equipment rooms, animal holding suite, toilets, break rooms (remaining floor area).

3rd fl.

Demolish Dental School lecture rooms, administration offices. Build Medical Education 184-seat tiered lecture hall, 44-seat case-study room, 4 seminar/conference rooms. Build elevator lobby, Medicine faculty office suite with 11 offices.

4th fl., roof

Build mechanical penthouse addition (4th fl. west roof setback) with new air-handler system. Replace 3 air-handler systems. Build new exterior, interior exhaust risers, 2 rooftop exhaust fan systems.

[ Back to top ]

Anticipated Completion

Phase I (1st fl.): 10/01/03
Phase II (Basement, 2nd fl., 3rd fl.): 03/01/04

[ Back to top ]

 
 