Facilities Management > Design & Construction > Completed Project Gallery > Tarry Research & Education Center

Tarry Research & Education Center

Project Team
Project Description & Statistics

Project Team

Project Management

Gabor M. Zsolnay, Facilities Management Design and Construction

Architect, Engineers & Consultants

Perkins & Will (Chicago, IL), Lead Architect & Engineer
Earl Walls & Associates (San Diego, CA), Laboratory Planning
Wiss, Janney, Elstner Assoc. (Chicago, IL), Precast & Curtain wall

General Contractor

Schal Bovis, Inc. (Chicago, IL)

[ Back to top ]

Project Description & Statistics

The Tarry Building, located at 300 East Superior Street, within the McGaw Medical Center, on the Chicago Campus of Northwestern University, is an expansion of the existing facilities in the adjacent complex made up of the Montgomery Ward Memorial Building, the Morton Medical Research Building, and the Searle Medical Research Building. It was developed to provide research and education space for basic science, clinical research, teaching and support services.

Construction began in October, 1987 and was completed January, 1990.

  • 160,000 net square feet
  • 272,000 gross square feet
  • .59 efficiency (gross/net)

The Tarry Research & Education Building, a 17-story high rise structure, is situated on a typically compact downtown site, approximately 105' x 148'. In addition to laboratories, offices and support facilities, the building includes the Chicago Campus loading dock, utility shafts to facilitate future upgrading of adjacent buildings, and underground connections to the Northwestern Memorial Hospital. The design team was challenged by limited floor-to-floor elevations which were required in order to accommodate inter-connection with the existing adjacent buildings.

Project Cost: ~$60,000,000