Facilities Management > Design & Construction > Completed Project Gallery > Pancoe Life Sciences Pavilion

The Arthur & Gladys Pancoe Evanston Northwestern Heachcare Life Sciences Pavilion

Project Team
Project Description & Statistics
Completion Date


Project Team

Project Management

Ron Nayler, Associate Vice President for Facilities Management
Bonnie Humphrey, Director of Facilities Management Design and Construction
Quentin Bruhn, Senior Project Manager
Kory Burton, Project Manager

Architect, Engineers & Consultants

Zimmer Gunsul Fransca Partnership (Los Angeles, CA) Architect
Chris P. Stefanos Associates, Inc. (Oak Lawn, IL) Structural Engineer
Bard, Rao + Athanas Consulting Engineers, Inc. (Chicago, IL) MEP Engineer
Terra Engineering, Ltd. (Chicago, IL) Civil Engineer

General Contractor

Walsh Construction Company of Illinois (Chicago, IL)

[ Back to top ]

Project Description & Statistics

The building committee stated that the simple and primary goal for Northwestern University is to do good science. This project is to provide additional facilities for this to happen. Inherent in the success of this mission is a state-of-the-art animal facility that will provide convenient access to animals for the researches who need it and limit that exposure otherwise.

  • The primary driving force behind this project is the need to provide outstanding facilities for the Center for Experimental Animal Research (CEAR). Providing modern, flexible and fully accredited animal facilities for research must be a cornerstone of this project.
  • A major goal of this project is to provide Northwestern University with a first class life sciences research facility with quality research space both to accommodate existing life sciences faculty and to be used as a recruitment tool for future faculty.
  • The new faculty should provide the appropriate types and amounts of space to engender viable, dynamic mix of faculty and to provide space for research organized by thematic unit for both Northwestern University and Evanston Hospital.
  • Science is by its nature subject to change, and the project should provide appropriate flexibility in building systems, casework, etc. to accommodate changes quickly and easily.

A 88,000 nsf new research building including research laboratories, faculty offices, vivarium, auditorium and cafe. 4 story building with 1 basement level. Project also includes bridge connections to both Hogan and Materials & Life Sciences and new loading dock adjacent to Hogan. The first phase of construction will build the structure, vivarium, cafe, and laboratory build-out of four floors of the north wing.

Project Cost: $65,000,000 (First Phase)

[ Back to top ]

Completion date

Spring 2003

[ Back to top ]

Photos by Glynn Ash

 

 
 